SpaceTRCSpaceTRC/Research platform
Let’s collaborate
SpaceTRC / Cosmos

NASA and JAXA: America’s and Japan’s Space Agencies

The completing chapter of SpaceTRC's institution/company files series: NASA's and JAXA's 2025-2026 record, from Artemis II's historic flight and the 2026 budget fight to JAXA's MMX mission bound for Phobos.

← CosmosTürkçe

COSMOS · INSTITUTION FILE

In this series SpaceTRC has already profiled private companies (SpaceX, Blue Origin, Rocket Lab and Axiom Space, then the “second wave” of Virgin Galactic, Sierra Space, ispace and Firefly Aerospace), our own national program — Turkey’s Space Agency (TUA) and Türksat — and the major state agencies ESA, CNSA, ISRO and Roscosmos. This page turns to the series’ two biggest remaining gaps: NASA, the world’s best-funded space agency, and Japan’s JAXA, which punches above its modest budget with a reputation for precision engineering. Both had events in 2025-2026 that will stand in spaceflight history books.

NASA’s year was shaped by a budget fight followed by a historic Moon flight; JAXA’s by a rocket failure, a return to flight, and the successful launch of the first-ever sample-return mission to a moon of Mars. The lesson SpaceTRC keeps returning to in this series holds here too: budget size alone does not guarantee progress — reliability and political backing matter just as much.

Agency Country Founded Current Budget Flagship Program Current Status
NASA United States 1958 FY2026 budget of $24.4 billion passed by Congress (plus supplemental funding, bringing the total to about $27.5 billion) Artemis II (completed) / Artemis III / Moon Base and commercial landers Artemis II completed the first crewed Moon flight in over 50 years in April 2026; Congress largely rejected the White House’s deep cuts, but Mars Sample Return was still cancelled
JAXA Japan 2003 Initial FY2025 budget of about ¥154.5 billion (roughly $1 billion) MMX (en route to Phobos) / H3 rocket / Gateway and rover contributions to Artemis The successful October 2026 launch of MMX proved the H3 rocket’s reliability for a second straight time after its December 2025 failure

NASA — NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (1958)

Founded in 1958 in response to the Soviet Union’s launch of Sputnik, NASA is the United States’ civilian space agency, headquartered in Washington, D.C. and spread across ten field centers including Kennedy, Johnson, Goddard and JPL. Its current administrator, entrepreneur-astronaut Jared Isaacman, was confirmed by the Senate on December 17, 2025, after his first nomination had been shelved amid a rift between Elon Musk and the White House; Transportation Secretary Sean Duffy had run the agency on an acting basis for most of the preceding year.

The FY2026 budget became the sharpest political fight in NASA’s recent history. The White House’s May 2025 budget blueprint proposed to nearly halve the science budget, cancel Mars Sample Return as financially unsustainable, retire SLS and Orion after Artemis III, end the Gateway program, and hand the International Space Station to commercial successors by 2030 — roughly a $6 billion cut overall. Congress rejected most of it: the Senate passed a $24.4 billion NASA budget 82-15 on January 15, 2026, and the House 397-28; a separate law, the One Big Beautiful Bill Act, added roughly $10 billion over six years, pushing the FY2026 total to about $27.5 billion. Where the White House sought $3.9 billion for the Science Mission Directorate, Congress provided $7.25 billion, saving dozens of missions — including DAVINCI, VERITAS, New Horizons, Juno and OSIRIS-APEX, several of which SpaceTRC covers on their own pages. Mars Sample Return’s cancellation was not reversed; NASA is now studying cheaper ways to bring the samples home.

Against that backdrop, NASA delivered a milestone in human spaceflight history: Artemis II launched on April 1, 2026, from Pad 39B at Kennedy Space Center aboard an SLS rocket. In the Orion capsule the crew named Integrity — commander Reid Wiseman, pilot Victor Glover, mission specialist Christina Koch, and the Canadian Space Agency’s Jeremy Hansen — flew a roughly 10-day free-return trajectory around the Moon, coming within 4,067 miles (about 6,540 km) of the lunar surface on April 6. Splashing down in the Pacific off San Diego on April 10, the crew had travelled 695,081 miles (1.12 million km) in total, reaching 252,756 miles from Earth at their farthest point — breaking the distance record set by the Apollo 13 crew in 1970. They became the first humans to the Moon in more than half a century, and the first crew to fly SLS and Orion.

Artemis III has since slipped about a year, to 2028; a 2027 mission will send a new Orion crew to test integrated operations with commercial landers in low Earth orbit without touching down. After concluding that SpaceX’s Starship-based Human Landing System was falling behind schedule, NASA reopened the contract to other providers in October 2025, then selected Blue Origin and its Blue Moon lander as a second Artemis lander provider in May 2026, alongside nearly $1 billion in new investment for initial uncrewed Moon Base missions — part of a Moon Base contract family worth close to $10 billion in total. The plan to retire the International Space Station around 2030 in favor of commercial successors such as Axiom, Vast and Starlab remains in place.

NASA co-leads or funds most of the missions SpaceTRC covers on their own pages — BepiColombo, Hera, JUICE, the Parker Solar Probe, Psyche, SPHEREx, Roman and Rubin — so this page does not repeat that ground; it exists to take stock of the agency as a whole in 2025-2026. One last note of Turkish interest: under the NASA-led Artemis Accords framework, Turkey became the 71st signatory in September 2026, and Minister of Industry and Technology Mehmet Fatih Kacır used the occasion to announce a hybrid-propulsion lunar orbiter project targeted for launch in early 2027 — a detail SpaceTRC also touches on its ESA page, underscoring how Turkey’s space diplomacy is institutionally tied to NASA.

JAXA — JAPAN AEROSPACE EXPLORATION AGENCY (2003)

JAXA took its present form in 2003 through the merger of three earlier bodies: ISAS, which ran scientific research; NASDA, which handled applied space programs; and NAL, an aeronautics research institute. Its development and control centers sit in Tsukuba (Ibaraki) and Chōfu (Tokyo), while launches take place from Tanegashima Space Center in the south; space-policy scholar Hiroshi Yamakawa has led the agency since 2023. JAXA’s initial FY2025 budget came to roughly ¥154.5 billion — around $1 to $1.1 billion depending on the exchange rate — less than a twentieth of NASA’s current budget, making JAXA one of the smallest-funded of the world’s major space agencies.

JAXA’s next-generation H3 rocket has had an uneven record since its 2023 debut. Its predecessor, the H-IIA, retired in June 2025 with a near-legendary reliability record of 49 successes in 50 flights (98%); H3 has not yet matched that standard. A December 2025 H3 launch was lost along with the navigation satellite it carried; JAXA returned the rocket to flight successfully in June 2026 with the debut of a lower-cost H3-30 variant. The rocket’s tenth flight, in October 2026, carried JAXA’s most ambitious deep-space mission yet — MMX, the Martian Moons eXploration — making that launch doubly important as a second consecutive proof of the rocket’s reliability.

MMX lifted off from Tanegashima on October 20, 2026 (Japan time), bound for Phobos, one of Mars’s two moons and one that has never been explored by any spacecraft. The probe — built from propulsion, exploration and return modules and carrying thirteen scientific instruments — will reach the Mars system in 2027, spend roughly 2027 to 2030 in a quasi-satellite orbit around Phobos making two landings to collect at least 10 grams of regolith while also observing Deimos, then depart the Mars system in 2030 for a roughly year-long cruise home, releasing its sample capsule for recovery in Australia in 2031. If successful, MMX will be the first mission ever to return a sample from a moon of Mars — the next step beyond the asteroid samples JAXA’s Hayabusa2 brought home.

JAXA’s role in Artemis is built on infrastructure and partnership rather than its own crewed missions: it is building Gateway’s habitation module together with ESA, plans to resupply the station with its HTV-X cargo spacecraft, and has an agreement with NASA to fly two Japanese astronauts and a pressurized, Toyota-built lunar rover on future surface missions; Trump and Prime Minister Shigeru Ishiba reaffirmed that Artemis partnership in February 2026. When NASA’s proposed budget cuts made headlines, Yamakawa struck a measured tone, saying, “if the U.S. were considering a better alternative in terms of budget or economics, we must respond to it,” and noting Japan could still contribute resupply capability, landing technology, a rover, or lunar water data from its joint LUPEX mission with India to a cheaper lunar architecture. JAXA’s other deep-space fronts include its Mio spacecraft aboard BepiColombo, the ongoing legacy of Hayabusa2’s asteroid samples, and the XRISM X-ray telescope; on the commercial side, Japan’s ispace is covered separately on SpaceTRC’s “second wave” page.

TWO SCALES, TWO DIFFERENT STRATEGIES

NASA and JAXA sit at opposite ends of how government-backed spaceflight can work. NASA’s budget is more than twenty times JAXA’s, but that scale cuts both ways: the 2026 budget fight showed an administration can propose slashing half of a science program, even as Congress — across party lines — reverses most of that. Even Artemis II’s historic success wasn’t insulated from that tension: the same year brought both the biggest human-spaceflight achievement in 50 years and a fight over the future of the agency’s core science missions. At JAXA, the story runs in reverse: the budget is comparatively small and uncontested, but the real variable determining whether ambitious missions like MMX succeed is the H3 rocket’s reliability — a December 2025 loss followed by two consecutive successes. JAXA has no crewed-spaceflight ambitions of its own; its leverage comes from a precision-engineering legacy running from SLIM to Hayabusa2, and from close partnerships with NASA, ESA and ISRO. Both agencies, in their own way, reconfirmed the lesson this series keeps returning to: progress in space is measured by neither budget size nor any single mission, but by political backing, engineering reliability and the ability to withstand a shifting timeline, all at once.

SOURCES

SpaceTRC editorial compilation · November 2026.

COMMENTS & QUESTIONS

Share your observations, ask a question, or point out something we should add. Comments are reviewed before they appear.

Leave a comment or question

Leave a Reply

*

SPACETRC / KNOWLEDGE

Follow your curiosity.

SPACETRC / GET STARTED

What would you like to do?

This short guide is available in six languages. Full scientific articles are in Turkish and English.

Open a workspace

Search publicationsExamine dataSpace eventsPlan a team projectPrepare a publication

Take selected reading with you

Open Turkish and English dossiers and introductory lessons in the reading area. Offline preparation and installation options are available there.

Open the offline library ↗

The language preference stays in this browser; no account or location permission is required.